Byron Bay Public School Upgrade
Principle Contractor: Bennett Contractors
Scaffold: Approx 2000 sqm
Status: Current
-
Construction has commenced on the new Public School Building, after a lengthy delayed start due to remediation works that were required, the project has run seamlessly. A simple 3brd wrap to the perimeter with a second skin required for roof edge protection.
Charlotte Street Brisbane
Principle Contractor: Dapcor
Scaffold: Built off Needles on 44th Floor
Status: Current
Wickham Street Brisbane
Principle Contractor: Mainbrace
Scaffold: 50m Stretcher Stair
Status: Current
-
A scaffold Stretcher Stair extending 50m above the ground, atop an independent gantry system. This stair pushed all the boundaries well beyond the standard limits that the system is capable of. Where there is a will there is a way, and with the additional bracing and engineering requirements, the system was configured to support the required structure.
Griffiths University
Principle Contractor: CPB Contractors
Scaffold: Approx 8000 sqm
Status: Current
- Construction of the new academic building commenced in September 2018 and will be completed in late 2019. The 6 Level large footprint building has a short build stage with slab pours weekly.
Transport House
Principle Contractor: Built
Scaffold Sqm: Approx 4000 sqm
Status: Completed
- Commencing 5 Levels from ground, suspended off 42 I-beams and pushed out through the existing walls, the scaffold wraps the Transport House tower 9 more levels to contain the building whilst undergoing its refurbishment. The entire build completed in 2 weeks.
Hamilton Island
Principle Contractor: Paynter Dixon